Out of VMware

Out of VMware — with a plan, and without risk.

Broadcom's licensing model has redefined the economics of VMware. We've migrated 30+ environments to Proxmox VE in the last 24 months — including ESXi clusters, Veeam backup chains, and NSX networking. Vendor-independent migration, planned in waves, reversible until cutover.

ESXi-import natively supported in Proxmox since 7.4.

Migration runs in waves — risk is bounded per wave.

Veeam replacement and NSX-equivalent included in scope.

“Sysfacts is the only Proxmox partner in DACH that delivers strategy, migration, operations and training as one engineering team."

CIO, Mid-Market Group, Manufacturing

The Broadcom reality

Why VMware is no longer the safe default.

A fixed, standardized path from discovery to strategy to implementation,followed by ongoing assurance operations. Standardized in method anddeliverables—scalable via scope, tiering, data volume, and service level.

Hand plugs a pink network cable into a port on a network switch with an orange cable connected above.
B — 001
Perpetual licenses eliminated.
Only subscription bundles available. No more "buy once, run forever" — every renewal is a contract negotiation.
B — 002
Free ESXi hypervisor discontinued.
The community / lab edition is gone. No zero-cost entry point to evaluate, train, or run dev environments.
B — 003
Two consolidated SKUs at higher prices.
vSphere Foundation and vSphere Cloud Foundation. Pricing increases of +200% to +500% reported across the customer base.
B — 004
Partner program restructured.
Smaller resellers cut. Roadmap and partnership uncertainty for organizations that depended on regional VMware partners.

How we migrate

Three phases. Defensible at every step.

We design Proxmox clusters around three proven architectures. Choose by recovery objectives, scale, and existing infrastructure.

1

PHASE 1 (1–2 weeks)

Migration Assessment.

Inventory, dependencies, sizing, business case, risk catalog.

Output: Migration plan + cost projection.

2

PHASE 2 (4–12 weeks)

Wave Execution.

Pilot, waves, cutover.

Reversible until decommission.

Rollback plan per wave.

Output: Live cluster, workloads migrated.

3

PHASE 3 (2–4 weeks)

Post-Migration Hardening.

HA validation, DR drill, runbook handover.

Optional transition into 24x7 Managed.

Output: Hardened cluster + handover.

Hand plugs a pink network cable into a port on a network switch with an orange cable connected above.

What we replace

Full-stack VMware replacement, not a half-migration.

We design Proxmox clusters around three proven architectures. Choose by recovery objectives, scale, and existing infrastructure.

Close-up of black server hardware with glowing green indicator lights in a dark data center rack.

ESXi / vSphere → Proxmox VE (Cluster design, migration, operations)

vCenter → Proxmox cluster manager + Datacenter Manager (Multi-cluster federation)

Close-up of yellow fiber optic cables connected to a network patch panel with blue connectors and warning labels.
Close-up of organized green network cables connected to a patch panel with white Ethernet cables labeled CAT.6A at the bottom.

Veeam → Proxmox Backup Server

NSX → Proxmox SDN (VXLAN, EVPN)

Close-up of yellow fiber optic cables connected to a network patch panel with blue connectors and warning labels.
Close-up of organized green network cables connected to a patch panel with white Ethernet cables labeled CAT.6A at the bottom.

Horizon → KASM Workspaces on Proxmox

30+

Migrations in 24 months

4,000+

VMs migrated

0

Unplanned cutover downtimes

100%

Vendor-independent

What customers say about their VMware exit.

Lorem ipsum dolor sit amet, est mollis iuvaret officiis ne, magna idque mentitum ei nec, iisque convenire similique cu sit.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.

“The combination of precise planning and consistent responsibility enabled us to make a risk-free transition without a fallback environment. Sysfacts proved that the right approach saves costs and ensures quality.”

Thomas Berger

IT manager at a medium-sized manufacturing company

Young man with wavy dark hair, beard, and glasses smiling outdoors near a pool.
DRAG
Common questions

Migration FAQ

Can we migrate without downtime?

For most workloads, yes. We use parallel-run patterns: the Proxmox cluster runs alongside ESXi, workloads cut over individually with a tested rollback path. True zero-downtime requires application-side cooperation; we plan that with your application owners during the assessment.

What happens to our Veeam licenses and existing backups?

Existing Veeam restore points remain readable until your retention expires. We can run Veeam in parallel with PBS for the transition period. Long-term we usually replace Veeam with PBS — see the dedicated /backup page for the comparison.

What about NSX micro-segmentation policies?

Proxmox SDN with EVPN provides equivalent segmentation. We map your NSX policies to SDN zones during the assessment. See /sdn for details.

Can we run Proxmox and VMware in parallel during migration?

Yes — and we recommend it. Proxmox can boot ESXi VMs directly via the native importer, allowing wave-based migration with rollback at any time.

Start the conversation

Make Broadcom's next renewal letter irrelevant.

A Migration Assessment in 1–2 weeks gives you a migration plan with cost projection — defensible, dated, signed off.

1
Featured
Path A
Migration Assessment.
1–2 weeks.
Inventory, sizing, dependency analysis.
You receive a migration plan with cost projection.
2
Path B
30-min Architect Call.
Useful when you want to test the idea before committing to an assessment.
3
Path C
Workshop on Architecture. 1–2 days.
If you've already decided to migrate but want depth on the target architecture.